您好,欢迎访问济南液压升降机械销售中心官网!

济南液压升降机械销售中心

 多年以来一直专注于生产销售液压升降机械设备

全国24H热线服务电话:

152-5313-4653

您当前的位置 :首 页 > 客户案例 > 济南荣凯登车桥电缆保护架如何安装?

济南荣凯登车桥电缆保护架如何安装?

2022-11-16 16:13:18
693次

1、首先用起重工具将荣凯登车桥http://www.sdsjpt.net/电缆卷悬挂于电缆筒上方,放出约2.5米的电缆,以便把电缆接到电源箱上。
First with the wing lifting axle Kadant cable suspended above the cable drum roll, the release of about 2.5 meters of cable for the cable to the power supply box.
 
2、其次从登车桥电缆筒底部拉出电缆至电源箱,暂不要连接;将电缆一圈一圈顺时针放入电缆筒中,尽量使每圈一样大,其直径略小于电缆筒直径;将电缆固定在电缆托架上,将电缆插头插入插座;将电缆接至电源箱上,启动登车桥检查电缆是否缠绕。
Secondly pulled from the bottom of the dock leveler cable drum cable to the power supply box, temporarily do not connect; clockwise circle around the cable into the cable drum, try to make each lap as big a diameter slightly smaller than the diameter of the cable drum; the cable fixed on cable trays, cable plug into the outlet; the cables to the power supply box, start Ramps check the cable is wound.
  
3、然后在登车桥http://www.sdsjpt.net/导轨架加高的过程中要同时安装电缆保护架,调整电缆保护架以及电缆托架的位置,确保电缆在电缆保护架“U”形中心。
Ramps and rails in the rack heightening process to install the cable protection bracket, adjust the position of the cable protection frame and cable tray, make sure the cable in the cable protection frame "U" shaped center.

 

快速导航

· 产品展示                · 客户案例              

· 厂容厂貌                · 新闻动态              

· 行业知识                · 常见问题             

· 关于我们                · 联系我们             

联系我们

公司名称:济南液压升降机械销售中心

联系人:安经理

电话:152-5313-4653

邮箱:347299818@qq.com

网址:www.sdsjpt.net

地址:山东省济南市济北开发区

手机移动端

微信扫一扫