1、升降舞台http://www.sdsjpt.net/盘外的配线应采用切当的方式进行关怀,好比软管、钢管等,并且布线应走机床不易损伤的中央,盘外机床之间的连线或电源线等必须放入桥架中,桥架用底座进行撑持。
Wiring landing stage outside the disk should be cut when caring way, like a hose, pipe, etc., and wiring should go easily damage the central machine, dish machine between external wires or power lines must be placed in trays , bridge carried by the base support.
2、升降舞台盘外配管应做到归正抗衡,盘外所有的电线邻接都要在连贯箱内进行,线的两端不克不及有找寻。
Landing stage plate outside the pipe should be done anyway to compete, all the wires adjacent to the outer disc to be in the box were consistent at both ends of the line can not have sought.
3、升降舞台http://www.sdsjpt.net/中继合端子台的同一端子顶多连贯两根电线,3根以上时请设置其他的端子台,感触器布线如在易被撞部位发展时,应运用软管作爱惜,软管应尽量套在感触器根部。
Landing stage relay terminal block together coherent same terminal at most two wires, set when three or more other terminal blocks, wire feeler as easy to hit the site at the time of development, should be used as a spare hose, the hose should try to set the feeler roots.
公司名称:济南液压升降机械销售中心
联系人:安经理
电话:152-5313-4653
邮箱:347299818@qq.com
网址:www.sdsjpt.net
地址:山东省济南市济北开发区
手机移动端
微信扫一扫